Join our forum Subscribe to mailing lists
Join a chatroom Join a meeting
Browse the site by category

(Closed) RFP|| A POWER INTERCONNECTION PRE-FEASIBILITY STUDY BETWEEN ST KITTS AND NEVIS AND PUERTO RICO (Deadline: July 7, 2011)

According to the World Bank report, a 400MW interconnection between Nevis and Puerto Rico can become highly economic if geothermal electric power from Nevis replaces heavy fuel oil (HFO) in Puerto Rico.

The purpose of this RFP is to select a consulting firm to produce a pre-feasibility study of the
inter-island electrical interconnection between the Federation of St. Kitts and Nevis and Puerto
Rico.

[download id=”307″]

Deadline: July 7, 2011



Category/ies:Request for Proposals.
RSS: RSS 2.0 Both comments and pings are currently closed.

Comments are closed.




View My Stats